The main inclined shaft of Libi Mine has high gas content and high gas pressure in the No.3 coal seam area. It is a dangerous area for outburst, and comprehensive outburst prevention measures need to be taken. When regional extraction and outburst prevention measures are taken, the construction pilot tunnel is used as the extraction drilling field, which solves the problem of limited construction site of extraction drilling. The gas content after extraction is reduced from 19.56 m3/t to 4.94-7.76 m3/t by using the techniques of hole expansion, closure of extraction drilling and reservation of water and slag storage space. At the same time, the No.3 coal seam was successfully uncovered by a series of measures such as regional verification before 5 m normal distance, coal uncovering before 2 m normal distance, strengthening support of metal skeleton, and long-distance blasting of ' coal gate '. Aiming at the problem that the main inclined shaft has a long stage of ' crossing the coal gate ' and the long-distance blasting can not open the No.3 coal seam at one time, the drilling cuttings index method was used to predict the outburst risk of the heading face in the coal seam section of 9 cycles. After each prediction of no outburst risk in the working face, the heading operation was carried out and the coal seam was passed smoothly. The comprehensive outburst prevention technology of main inclined shaft uncovering coal in Libi Mine solves the technical problems of inclined shaft construction in outburst mine, and provides technical reference for inclined shaft uncovering coal in outburst mine at home and abroad
文章内容来自网络,如有侵权,联系删除、联系电话:023-85238885
参与评论
请回复有价值的信息,无意义的评论将很快被删除,账号将被禁止发言。
评论区